Its position on the rails can be adjusted, hole drilled out of the to. Balls can also be fed onto the track diagonally by installing 4. or Z4. As they fall through, the balls may hit others rolling through underneath, a fascinating co-ordination game. Can also be assembled directly on the rails as a substructure for small towers.